Nijmegen
Certificaten:

Location

Information

Roggeweg 30
6534 AJ
Nijmegen
The Netherlands
06-18390960
nvt
000021605157
Onbeperkt
10 - 19
Stabu, Raw, Nl/sfb, Sato
44.31 Panelenplafonds D A C
44.41 In het werk af te werken systeemwanden D A C
44.00 Plafond- en wandsystemen D A
44.32 Strokenplafonds D A
44.33 Lamellenplafonds D A
44.34 Roosterplafonds D A
44.35 Rasterplafonds D A
44.36 Baffle-plafonds D A
44.37 Gipsplaatplafonds D A
44.38 Plafondelementen en -onderdelen D A
44.42 Vooraf afgewerkte systeemwanden D A
44.42.a Systeemwanden utiliteitsbouw D A
45.00 Afbouwtimmerwerk D A
45.41.a Brandwerende bekledingen D A
45.46 Aftimmeringen D A
45.81 Isolatie D A
22.1 Internal walls, non-load bearing D A
22.13 Internal walls, non-load bearing, system walls; fixed D A
22.14 Internal walls, non-load bearing, system walls; movable D A
45 Ceiling finishes: general D A
45.1 Ceiling finishes; suspended D A
45.10 Ceiling finishes; suspended, general (collection level) D A
45.11 Ceiling finishes; suspended, suspended ceilings D A
45.12 Ceiling finishes; suspended, system ceilings D A
45.14 Ceiling finishes; suspended, cove construction D A
45.15 Ceiling finishes; suspended, curtain board D A
45.2 Ceiling finishes; not-suspended D A
45.20 Ceiling finishes; not-suspended, general (collection level) D A
45.21 Ceiling finishes; not-suspended, finishes D A
45.22 Ceiling finishes; not-suspended, coverings D A
45.23 Ceiling finishes; not-suspended, system finishes D A
45.24 Ceiling finishes; not-suspended, cove construction D A
45.25 Ceiling finishes; not-suspended, curtain boards D A

Description

Reference projects

mtm totaalafbouw
Deron
2018
Gendt
mtm totaalafbouw
mtm totaalafbouw
marku bouw
2018
nijmegen
marku bouw
Ziekenhuis Zevenaar 4e verdieping
nvt
2016
Zevenaar
nvt
Ziekenhuis Zevenaar 1e verdieping
Nvt
2016
Zevenaar
Nvt

Want to see more results?

Because 12Build allows you to filter in your personal overview of construction partners, you always select the party, which best suits your project. Next, you can share all relevant documents via 12Build and the communication will be clear. This way you will always get the best offers.

Start (free) with 12Build